{"id":44515,"date":"2026-06-23T14:27:18","date_gmt":"2026-06-23T04:27:18","guid":{"rendered":"https:\/\/www.infrabuild.com\/?post_type=case_study&#038;p=44515"},"modified":"2026-06-23T14:27:25","modified_gmt":"2026-06-23T04:27:25","slug":"how-prefabrication-improved-construction-productivity-at-aldi-tarneit","status":"publish","type":"case_study","link":"https:\/\/www.infrabuild.com\/case-studies\/how-prefabrication-improved-construction-productivity-at-aldi-tarneit\/","title":{"rendered":"How prefabrication improved construction productivity at ALDI Tarneit"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">When construction programmes come under pressure, finding time without compromising quality, safety or productivity can be one of the biggest challenges on site.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At ALDI&#8217;s new distribution centre in Tarneit, Victoria, <a href=\"https:\/\/www.infrabuild.com\/reinforcing\/products\/prefabrication\/barmat\/\" type=\"product\" id=\"19305\">BARMAT\u00ae<\/a> prefabricated reinforcing mesh helped recover valuable time in the construction schedule, supporting the project team to maintain momentum on one of Australia&#8217;s largest logistics developments.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">InfraBuild Reinforcing supplied BARMAT\u00ae through <a href=\"http:\/\/arcreo.com.au\" type=\"link\" id=\"arcreo.com.au\" target=\"_blank\" rel=\"noreferrer noopener\">ARC<\/a> to Calibre Concrete Group, the concrete contractor responsible for delivering more than 183,000 square metres of concrete works across the site. ARC helped deliver this project end-to-end.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Project at a glance<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>102,000m\u00b2<\/strong> distribution centre<\/li>\n\n\n\n<li><strong>183,000m\u00b2<\/strong> of concrete works delivered<\/li>\n\n\n\n<li><strong>500+ tonnes<\/strong> of prefabricated reinforcement installed in suspended slabs<\/li>\n\n\n\n<li><strong>32 days<\/strong> recovered across the suspended slab programme<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Supporting one of Australia&#8217;s largest distribution centres<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Located within the Tarneit Logistics Hub in Melbourne&#8217;s west, the new ALDI Distribution Centre spans 102,000 square metres and represents a significant investment in Victoria&#8217;s supply chain infrastructure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Developed by Charter Hall and constructed by Qanstruct, the fully automated facility features ultra high-bay warehousing, temperature-controlled storage and advanced logistics technology capable of processing close to 2.3 million pallets annually.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As part of the project, Calibre Concrete Group delivered:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>70,000m\u00b2 of warehouse floor slabs<\/li>\n\n\n\n<li>85,000m\u00b2 of hardstands<\/li>\n\n\n\n<li>28,000m\u00b2 of suspended slabs<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The scale of the concrete package demanded a solution that could support productivity while helping the project team meet critical delivery milestones.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">A programme under pressure<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Like many major construction projects, the Tarneit development faced unforeseen challenges during delivery.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Delays in structural steel installation and formwork reduced the time available to complete suspended slab works, placing additional pressure on the construction programme.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Traditional suspended slab reinforcement requires significant on-site labour to place, tie and assemble individual reinforcing bars. With the programme already compressed, the project team needed a faster and more efficient approach.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Delivering productivity through prefabrication<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">To help recover lost time, the project team adopted BARMAT\u00ae prefabricated reinforcing mesh.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Manufactured off-site as pre-assembled reinforcing panels, BARMAT\u00ae eliminates the need to tie reinforcement bar by bar on site. Panels are lifted directly into place by crane, allowing installation teams to work quickly and efficiently across large slab areas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For the Tarneit project, the results were significant.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Each suspended slab was completed approximately one day faster than would have been achieved using traditional reinforcement methods, resulting in a total programme saving of 32 days across the suspended slab package.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;Switching to BARMAT\u00ae on the suspended slabs gave us back control of the programme. Eliminating the need to tie over 500 tonnes of steel on site made a significant difference to our sequencing and productivity, and the prefabricated panels installed efficiently with crane access across the site.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The solution worked great at Tarneit, especially with the large, open and consistent slab layouts.&#8221;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ryan Wong, Senior Project Manager, Calibre Concrete Group<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Designed for large-scale construction<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">BARMAT\u00ae is particularly effective on large, open slab areas where reinforcement layouts are consistent and repetitive.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The suspended slabs at Tarneit were ideally suited to this approach. With crane access across the site and a uniform reinforcing design, panels could be installed in sequence with minimal handling and reduced site labour requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">By prefabricating reinforcement off site and accounting for laps during manufacture, the solution also reduced on-site coordination and supported a smoother installation process.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Building more with less<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The Tarneit project demonstrates how prefabrication can help improve construction productivity and support project teams when programmes come under pressure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">While BARMAT\u00ae was introduced as a response to a scheduling challenge, its impact extended beyond programme recovery. By reducing on-site labour requirements and accelerating installation, it enabled the concrete team to maintain progress without compromising quality.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;Supplying BARMAT\u00ae through ARC, who delivered to a project of this scale, demonstrates how prefabricated reinforcing can help improve productivity on site. When programmes are under pressure, reducing installation time and on-site labour can make a meaningful difference to project outcomes. Recovering 32 days on a project of this scale is a strong example of the value prefabrication can deliver.&#8221;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Rupinder Saraan, Account Manager, InfraBuild Reinforcing<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Delivering practical outcomes<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">As Australia&#8217;s industrial and logistics sector continues to expand, project teams are increasingly looking for ways to improve productivity, reduce complexity and maintain programme certainty.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The ALDI Tarneit Distribution Centre highlights how prefabricated reinforcing solutions such as BARMAT\u00ae can help deliver practical outcomes on large-scale projects, supporting faster construction and helping customers build more with less.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Please contact us to learn more about how <a href=\"https:\/\/www.infrabuild.com\/reinforcing\/products\/prefabrication\/barmat\/\" type=\"product\" id=\"19305\">BARMAT\u00ae<\/a> can support your next project<\/strong><\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.infrabuild.com\/contact-us\/\">Contact us<\/a><\/div>\n<\/div>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1890\" height=\"1471\" data-id=\"44526\" src=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-4.png\" alt=\"\" class=\"wp-image-44526\" srcset=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-4.png 1890w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-4-1280x996.png 1280w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-4-720x560.png 720w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-4-768x598.png 768w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-4-1536x1195.png 1536w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-4-50x39.png 50w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-4-1600x1245.png 1600w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-4-150x117.png 150w\" sizes=\"auto, (max-width: 1890px) 100vw, 1890px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1890\" height=\"1471\" data-id=\"44525\" src=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-3.png\" alt=\"\" class=\"wp-image-44525\" srcset=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-3.png 1890w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-3-1280x996.png 1280w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-3-720x560.png 720w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-3-768x598.png 768w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-3-1536x1195.png 1536w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-3-50x39.png 50w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-3-1600x1245.png 1600w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-3-150x117.png 150w\" sizes=\"auto, (max-width: 1890px) 100vw, 1890px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1890\" height=\"1471\" data-id=\"44523\" src=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity.png\" alt=\"\" class=\"wp-image-44523\" srcset=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity.png 1890w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-1280x996.png 1280w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-720x560.png 720w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-768x598.png 768w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-1536x1195.png 1536w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-50x39.png 50w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-1600x1245.png 1600w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-150x117.png 150w\" sizes=\"auto, (max-width: 1890px) 100vw, 1890px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1890\" height=\"1471\" data-id=\"44521\" src=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-6.png\" alt=\"\" class=\"wp-image-44521\" srcset=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-6.png 1890w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-6-1280x996.png 1280w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-6-720x560.png 720w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-6-768x598.png 768w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-6-1536x1195.png 1536w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-6-50x39.png 50w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-6-1600x1245.png 1600w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-6-150x117.png 150w\" sizes=\"auto, (max-width: 1890px) 100vw, 1890px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1890\" height=\"1471\" data-id=\"44520\" src=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-5.png\" alt=\"\" class=\"wp-image-44520\" srcset=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-5.png 1890w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-5-1280x996.png 1280w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-5-720x560.png 720w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-5-768x598.png 768w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-5-1536x1195.png 1536w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-5-50x39.png 50w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-5-1600x1245.png 1600w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-5-150x117.png 150w\" sizes=\"auto, (max-width: 1890px) 100vw, 1890px\" \/><\/figure>\n<\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1890\" height=\"1471\" src=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-7.png\" alt=\"\" class=\"wp-image-44522\" srcset=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-7.png 1890w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-7-1280x996.png 1280w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-7-720x560.png 720w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-7-768x598.png 768w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-7-1536x1195.png 1536w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-7-50x39.png 50w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-7-1600x1245.png 1600w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-7-150x117.png 150w\" sizes=\"auto, (max-width: 1890px) 100vw, 1890px\" \/><\/figure>\n","protected":false},"author":179,"featured_media":44524,"menu_order":0,"template":"","meta":{"_acf_changed":false,"_members_access_role":[],"_members_access_error":""},"tags":[],"business_division":[111],"case_study_sector":[120],"case_study_solution":[247],"class_list":["post-44515","case_study","type-case_study","status-publish","has-post-thumbnail","hentry","business_division-reinforcing","case_study_sector-commercial","case_study_solution-barmat"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.2 (Yoast SEO v28.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>How prefabrication improved construction productivity at ALDI Tarneit - InfraBuild<\/title>\n<meta name=\"description\" content=\"Discover how BARMAT\u00ae prefabricated reinforcing mesh helped recover 32 days on a major distribution centre project, improving construction productivity and reducing on-site labour requirements.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.infrabuild.com\/case-studies\/how-prefabrication-improved-construction-productivity-at-aldi-tarneit\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How prefabrication improved construction productivity at ALDI Tarneit\" \/>\n<meta property=\"og:description\" content=\"Discover how BARMAT\u00ae prefabricated reinforcing mesh helped recover 32 days on a major distribution centre project, improving construction productivity and reducing on-site labour requirements.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.infrabuild.com\/case-studies\/how-prefabrication-improved-construction-productivity-at-aldi-tarneit\/\" \/>\n<meta property=\"og:site_name\" content=\"InfraBuild\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-23T04:27:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-2.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1890\" \/>\n\t<meta property=\"og:image:height\" content=\"1471\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/how-prefabrication-improved-construction-productivity-at-aldi-tarneit\\\/\",\"url\":\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/how-prefabrication-improved-construction-productivity-at-aldi-tarneit\\\/\",\"name\":\"How prefabrication improved construction productivity at ALDI Tarneit - InfraBuild\",\"isPartOf\":{\"@id\":\"\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/how-prefabrication-improved-construction-productivity-at-aldi-tarneit\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/how-prefabrication-improved-construction-productivity-at-aldi-tarneit\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.infrabuild.com\\\/wp-content\\\/uploads\\\/sites\\\/8\\\/2026\\\/06\\\/prefabricated-reinforcing-mesh-for-construction-productivity-2.png\",\"datePublished\":\"2026-06-23T04:27:18+00:00\",\"dateModified\":\"2026-06-23T04:27:25+00:00\",\"description\":\"Discover how BARMAT\u00ae prefabricated reinforcing mesh helped recover 32 days on a major distribution centre project, improving construction productivity and reducing on-site labour requirements.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/how-prefabrication-improved-construction-productivity-at-aldi-tarneit\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/how-prefabrication-improved-construction-productivity-at-aldi-tarneit\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/how-prefabrication-improved-construction-productivity-at-aldi-tarneit\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.infrabuild.com\\\/wp-content\\\/uploads\\\/sites\\\/8\\\/2026\\\/06\\\/prefabricated-reinforcing-mesh-for-construction-productivity-2.png\",\"contentUrl\":\"https:\\\/\\\/www.infrabuild.com\\\/wp-content\\\/uploads\\\/sites\\\/8\\\/2026\\\/06\\\/prefabricated-reinforcing-mesh-for-construction-productivity-2.png\",\"width\":1890,\"height\":1471},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/how-prefabrication-improved-construction-productivity-at-aldi-tarneit\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.infrabuild.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Case Studies\",\"item\":\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"How prefabrication improved construction productivity at ALDI Tarneit\"}]},{\"@type\":\"WebSite\",\"@id\":\"\\\/#website\",\"url\":\"\\\/\",\"name\":\"InfraBuild\",\"description\":\"Building futures through sustainable steel\",\"publisher\":{\"@id\":\"\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"\\\/#organization\",\"name\":\"InfraBuild\",\"url\":\"\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.infrabuild.com\\\/wp-content\\\/uploads\\\/sites\\\/8\\\/2022\\\/03\\\/infrabuild-logo.png\",\"contentUrl\":\"https:\\\/\\\/www.infrabuild.com\\\/wp-content\\\/uploads\\\/sites\\\/8\\\/2022\\\/03\\\/infrabuild-logo.png\",\"width\":400,\"height\":98,\"caption\":\"InfraBuild\"},\"image\":{\"@id\":\"\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"How prefabrication improved construction productivity at ALDI Tarneit - InfraBuild","description":"Discover how BARMAT\u00ae prefabricated reinforcing mesh helped recover 32 days on a major distribution centre project, improving construction productivity and reducing on-site labour requirements.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.infrabuild.com\/case-studies\/how-prefabrication-improved-construction-productivity-at-aldi-tarneit\/","og_locale":"en_US","og_type":"article","og_title":"How prefabrication improved construction productivity at ALDI Tarneit","og_description":"Discover how BARMAT\u00ae prefabricated reinforcing mesh helped recover 32 days on a major distribution centre project, improving construction productivity and reducing on-site labour requirements.","og_url":"https:\/\/www.infrabuild.com\/case-studies\/how-prefabrication-improved-construction-productivity-at-aldi-tarneit\/","og_site_name":"InfraBuild","article_modified_time":"2026-06-23T04:27:25+00:00","og_image":[{"url":"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-2.png","width":1890,"height":1471,"type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.infrabuild.com\/case-studies\/how-prefabrication-improved-construction-productivity-at-aldi-tarneit\/","url":"https:\/\/www.infrabuild.com\/case-studies\/how-prefabrication-improved-construction-productivity-at-aldi-tarneit\/","name":"How prefabrication improved construction productivity at ALDI Tarneit - InfraBuild","isPartOf":{"@id":"\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.infrabuild.com\/case-studies\/how-prefabrication-improved-construction-productivity-at-aldi-tarneit\/#primaryimage"},"image":{"@id":"https:\/\/www.infrabuild.com\/case-studies\/how-prefabrication-improved-construction-productivity-at-aldi-tarneit\/#primaryimage"},"thumbnailUrl":"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-2.png","datePublished":"2026-06-23T04:27:18+00:00","dateModified":"2026-06-23T04:27:25+00:00","description":"Discover how BARMAT\u00ae prefabricated reinforcing mesh helped recover 32 days on a major distribution centre project, improving construction productivity and reducing on-site labour requirements.","breadcrumb":{"@id":"https:\/\/www.infrabuild.com\/case-studies\/how-prefabrication-improved-construction-productivity-at-aldi-tarneit\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.infrabuild.com\/case-studies\/how-prefabrication-improved-construction-productivity-at-aldi-tarneit\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.infrabuild.com\/case-studies\/how-prefabrication-improved-construction-productivity-at-aldi-tarneit\/#primaryimage","url":"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-2.png","contentUrl":"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/06\/prefabricated-reinforcing-mesh-for-construction-productivity-2.png","width":1890,"height":1471},{"@type":"BreadcrumbList","@id":"https:\/\/www.infrabuild.com\/case-studies\/how-prefabrication-improved-construction-productivity-at-aldi-tarneit\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.infrabuild.com\/"},{"@type":"ListItem","position":2,"name":"Case Studies","item":"https:\/\/www.infrabuild.com\/case-studies\/"},{"@type":"ListItem","position":3,"name":"How prefabrication improved construction productivity at ALDI Tarneit"}]},{"@type":"WebSite","@id":"\/#website","url":"\/","name":"InfraBuild","description":"Building futures through sustainable steel","publisher":{"@id":"\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"\/#organization","name":"InfraBuild","url":"\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"\/#\/schema\/logo\/image\/","url":"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2022\/03\/infrabuild-logo.png","contentUrl":"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2022\/03\/infrabuild-logo.png","width":400,"height":98,"caption":"InfraBuild"},"image":{"@id":"\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/case_study\/44515","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/case_study"}],"about":[{"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/types\/case_study"}],"author":[{"embeddable":true,"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/users\/179"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/media\/44524"}],"wp:attachment":[{"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/media?parent=44515"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/tags?post=44515"},{"taxonomy":"business_division","embeddable":true,"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/business_division?post=44515"},{"taxonomy":"case_study_sector","embeddable":true,"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/case_study_sector?post=44515"},{"taxonomy":"case_study_solution","embeddable":true,"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/case_study_solution?post=44515"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}