{"id":44104,"date":"2026-06-02T08:00:00","date_gmt":"2026-06-01T22:00:00","guid":{"rendered":"https:\/\/www.infrabuild.com\/?post_type=case_study&#038;p=44104"},"modified":"2026-05-26T14:53:23","modified_gmt":"2026-05-26T04:53:23","slug":"partnering-for-progress-at-diggers-rest-smarter-supply-stronger-outcomes","status":"publish","type":"case_study","link":"https:\/\/www.infrabuild.com\/case-studies\/partnering-for-progress-at-diggers-rest-smarter-supply-stronger-outcomes\/","title":{"rendered":"Partnering for Progress at Diggers Rest: Smarter Supply, Stronger Outcomes"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The removal of the level crossings at Old Calder Highway and Watson Road in Diggers Rest has transformed a key transport link in Melbourne\u2019s outer northwest, improving safety, easing congestion and supporting a fast growing community.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Delivered as part of <a href=\"https:\/\/bigbuild.vic.gov.au\/projects\/level-crossing-removal-project\" target=\"_blank\" rel=\"noreferrer noopener\">the Victorian Government\u2019s Level Crossing Removal Project (LXRP)<\/a>, the upgrade replaced two level crossings with new road bridges, improving connections between Diggers Rest, Sunbury and surrounding suburbs and helping future proof one of Melbourne\u2019s fastest expanding corridors.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">InfraBuild Reinforcing partnered with Civil Infrastructure Group to support the delivery of reinforcement across key structures on the project, contributing both to the physical build and to how the project was delivered.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>A smarter way to deliver steel<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Diggers Rest was not just a construction project. It also became the pilot site for an industry first initiative to digitise the reinforced steel supply chain, led by the Level Crossing Removal Project, GS1 Australia and project partners including InfraBuild Reinforcing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As the primary steel supplier, InfraBuild trialled the use of:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Digital delivery dockets and invoices<\/li>\n\n\n\n<li>Improved site to office tracking for steel deliveries<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This created a more connected and transparent way to manage materials, improving accuracy, reducing manual handling and supporting better coordination between site and office teams.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">By helping lead this trial, InfraBuild contributed to a smarter approach to supply that reduces errors, minimises waste and limits contract disputes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cBeing part of the Diggers Rest pilot allowed us to demonstrate what a connected supply chain could look like, one where material traceability, document accuracy and on-site efficiency all improve through better data sharing. It\u2019s a strong step forward for the entire industry.\u201d<br>&nbsp;\u2014 David McNeil, Customer Experience Manager, InfraBuild<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Local steel, delivered with certainty<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">InfraBuild Reinforcing supplied a total of 478 tonnes of reinforcement to the project, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>415 tonnes of loose bar<\/li>\n\n\n\n<li>63 tonnes of prefabricated cages<\/li>\n\n\n\n<li>An additional 25 tonnes scheduled for final delivery<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">All steel was 100% manufactured locally, supporting Australian industry and meeting project requirements for local content.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At peak construction, up to two truckloads per day were delivered to align with critical build windows, helping keep the program on track and avoid delays.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Faster installation through prefabrication<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Prefabricated pier columns were manufactured at InfraBuild Reinforcing\u2019s Sunshine facility in Victoria and delivered directly to site, reducing on-site labour and improving installation speed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This approach allowed reinforcement to arrive ready for installation, improving safety and helping maintain momentum during key construction phases.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWorking closely with the delivery teams on Diggers Rest, our focus was on removing friction from site operations. Through consistent scheduling, prefabrication support and daily coordination, we helped keep the project moving at pace while ensuring quality and compliance every step of the way.\u201d<br>\u00a0\u2014 Ricardo Angola, Project Manager, InfraBuild Reinforcing<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Working through complexity<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Like any major infrastructure project, Diggers Rest presented challenges, including compressed timelines and complex reinforcement requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Working closely with the builder and design teams, InfraBuild provided:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Experienced detailing support to resolve complex drawings, queries and RFIs, improving reinforcement layouts and speeding up approvals<\/li>\n\n\n\n<li>Just in time delivery coordination aligned to site needs<\/li>\n\n\n\n<li>Prefabrication solutions with strict lifting specifications, reducing congestion and labour time on site<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Productivity that drives better outcomes<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">By improving how materials, data and schedules were managed across the project, the team reduced rework, minimised steel waste and shortened construction time.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These productivity gains also support better environmental outcomes, with fewer delays, less waste and more efficient use of materials.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>A stronger future, built together<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The successful removal of the Diggers Rest level crossings shows what can be achieved through strong partnerships, practical solutions and Australian made steel.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">By combining local manufacturing, prefabrication and a more connected supply approach, InfraBuild Reinforcing helped deliver both the infrastructure and a better way of working for future projects.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For more information on how we can support your project goals, get in touch with our team.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.infrabuild.com\/contact-us\/\">Contact us<\/a><\/div>\n<\/div>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1890\" height=\"1471\" data-id=\"44123\" src=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-9.png\" alt=\"\" class=\"wp-image-44123\" srcset=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-9.png 1890w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-9-1280x996.png 1280w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-9-720x560.png 720w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-9-768x598.png 768w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-9-1536x1195.png 1536w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-9-50x39.png 50w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-9-1600x1245.png 1600w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-9-150x117.png 150w\" sizes=\"auto, (max-width: 1890px) 100vw, 1890px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1890\" height=\"1471\" data-id=\"44117\" src=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-3.png\" alt=\"\" class=\"wp-image-44117\" srcset=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-3.png 1890w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-3-1280x996.png 1280w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-3-720x560.png 720w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-3-768x598.png 768w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-3-1536x1195.png 1536w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-3-50x39.png 50w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-3-1600x1245.png 1600w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-3-150x117.png 150w\" sizes=\"auto, (max-width: 1890px) 100vw, 1890px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1890\" height=\"1471\" data-id=\"44118\" src=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-4.png\" alt=\"\" class=\"wp-image-44118\" srcset=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-4.png 1890w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-4-1280x996.png 1280w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-4-720x560.png 720w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-4-768x598.png 768w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-4-1536x1195.png 1536w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-4-50x39.png 50w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-4-1600x1245.png 1600w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-4-150x117.png 150w\" sizes=\"auto, (max-width: 1890px) 100vw, 1890px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1890\" height=\"1471\" data-id=\"44120\" src=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-6.png\" alt=\"\" class=\"wp-image-44120\" srcset=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-6.png 1890w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-6-1280x996.png 1280w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-6-720x560.png 720w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-6-768x598.png 768w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-6-1536x1195.png 1536w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-6-50x39.png 50w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-6-1600x1245.png 1600w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-6-150x117.png 150w\" sizes=\"auto, (max-width: 1890px) 100vw, 1890px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1890\" height=\"1471\" data-id=\"44121\" src=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-7.png\" alt=\"\" class=\"wp-image-44121\" srcset=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-7.png 1890w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-7-1280x996.png 1280w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-7-720x560.png 720w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-7-768x598.png 768w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-7-1536x1195.png 1536w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-7-50x39.png 50w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-7-1600x1245.png 1600w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-7-150x117.png 150w\" sizes=\"auto, (max-width: 1890px) 100vw, 1890px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1890\" height=\"1471\" data-id=\"44122\" src=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-8.png\" alt=\"\" class=\"wp-image-44122\" srcset=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-8.png 1890w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-8-1280x996.png 1280w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-8-720x560.png 720w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-8-768x598.png 768w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-8-1536x1195.png 1536w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-8-50x39.png 50w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-8-1600x1245.png 1600w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-8-150x117.png 150w\" sizes=\"auto, (max-width: 1890px) 100vw, 1890px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1890\" height=\"1471\" data-id=\"44119\" src=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-5.png\" alt=\"\" class=\"wp-image-44119\" srcset=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-5.png 1890w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-5-1280x996.png 1280w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-5-720x560.png 720w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-5-768x598.png 768w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-5-1536x1195.png 1536w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-5-50x39.png 50w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-5-1600x1245.png 1600w, https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-5-150x117.png 150w\" sizes=\"auto, (max-width: 1890px) 100vw, 1890px\" \/><\/figure>\n<\/figure>\n","protected":false},"author":179,"featured_media":44116,"menu_order":0,"template":"","meta":{"_acf_changed":false,"_members_access_role":[],"_members_access_error":""},"tags":[],"business_division":[],"case_study_sector":[],"case_study_solution":[],"class_list":["post-44104","case_study","type-case_study","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.2 (Yoast SEO v28.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Partnering for Progress at Diggers Rest: Smarter Supply, Stronger Outcomes - InfraBuild<\/title>\n<meta name=\"description\" content=\"How InfraBuild supported the Diggers Rest level crossing removal with local steel, prefabrication and a smarter digital supply chain.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.infrabuild.com\/case-studies\/partnering-for-progress-at-diggers-rest-smarter-supply-stronger-outcomes\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Partnering for Progress at Diggers Rest: Smarter Supply, Stronger Outcomes\" \/>\n<meta property=\"og:description\" content=\"How InfraBuild supported the Diggers Rest level crossing removal with local steel, prefabrication and a smarter digital supply chain.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.infrabuild.com\/case-studies\/partnering-for-progress-at-diggers-rest-smarter-supply-stronger-outcomes\/\" \/>\n<meta property=\"og:site_name\" content=\"InfraBuild\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-2.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1890\" \/>\n\t<meta property=\"og:image:height\" content=\"1471\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/partnering-for-progress-at-diggers-rest-smarter-supply-stronger-outcomes\\\/\",\"url\":\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/partnering-for-progress-at-diggers-rest-smarter-supply-stronger-outcomes\\\/\",\"name\":\"Partnering for Progress at Diggers Rest: Smarter Supply, Stronger Outcomes - InfraBuild\",\"isPartOf\":{\"@id\":\"\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/partnering-for-progress-at-diggers-rest-smarter-supply-stronger-outcomes\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/partnering-for-progress-at-diggers-rest-smarter-supply-stronger-outcomes\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.infrabuild.com\\\/wp-content\\\/uploads\\\/sites\\\/8\\\/2026\\\/05\\\/Diggers-Rest-level-crossing-removal-steel-supply-2.png\",\"datePublished\":\"2026-06-01T22:00:00+00:00\",\"description\":\"How InfraBuild supported the Diggers Rest level crossing removal with local steel, prefabrication and a smarter digital supply chain.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/partnering-for-progress-at-diggers-rest-smarter-supply-stronger-outcomes\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/partnering-for-progress-at-diggers-rest-smarter-supply-stronger-outcomes\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/partnering-for-progress-at-diggers-rest-smarter-supply-stronger-outcomes\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.infrabuild.com\\\/wp-content\\\/uploads\\\/sites\\\/8\\\/2026\\\/05\\\/Diggers-Rest-level-crossing-removal-steel-supply-2.png\",\"contentUrl\":\"https:\\\/\\\/www.infrabuild.com\\\/wp-content\\\/uploads\\\/sites\\\/8\\\/2026\\\/05\\\/Diggers-Rest-level-crossing-removal-steel-supply-2.png\",\"width\":1890,\"height\":1471},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/partnering-for-progress-at-diggers-rest-smarter-supply-stronger-outcomes\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.infrabuild.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Case Studies\",\"item\":\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Partnering for Progress at Diggers Rest: Smarter Supply, Stronger Outcomes\"}]},{\"@type\":\"WebSite\",\"@id\":\"\\\/#website\",\"url\":\"\\\/\",\"name\":\"InfraBuild\",\"description\":\"Building futures through sustainable steel\",\"publisher\":{\"@id\":\"\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"\\\/#organization\",\"name\":\"InfraBuild\",\"url\":\"\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.infrabuild.com\\\/wp-content\\\/uploads\\\/sites\\\/8\\\/2022\\\/03\\\/infrabuild-logo.png\",\"contentUrl\":\"https:\\\/\\\/www.infrabuild.com\\\/wp-content\\\/uploads\\\/sites\\\/8\\\/2022\\\/03\\\/infrabuild-logo.png\",\"width\":400,\"height\":98,\"caption\":\"InfraBuild\"},\"image\":{\"@id\":\"\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Partnering for Progress at Diggers Rest: Smarter Supply, Stronger Outcomes - InfraBuild","description":"How InfraBuild supported the Diggers Rest level crossing removal with local steel, prefabrication and a smarter digital supply chain.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.infrabuild.com\/case-studies\/partnering-for-progress-at-diggers-rest-smarter-supply-stronger-outcomes\/","og_locale":"en_US","og_type":"article","og_title":"Partnering for Progress at Diggers Rest: Smarter Supply, Stronger Outcomes","og_description":"How InfraBuild supported the Diggers Rest level crossing removal with local steel, prefabrication and a smarter digital supply chain.","og_url":"https:\/\/www.infrabuild.com\/case-studies\/partnering-for-progress-at-diggers-rest-smarter-supply-stronger-outcomes\/","og_site_name":"InfraBuild","og_image":[{"url":"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-2.png","width":1890,"height":1471,"type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.infrabuild.com\/case-studies\/partnering-for-progress-at-diggers-rest-smarter-supply-stronger-outcomes\/","url":"https:\/\/www.infrabuild.com\/case-studies\/partnering-for-progress-at-diggers-rest-smarter-supply-stronger-outcomes\/","name":"Partnering for Progress at Diggers Rest: Smarter Supply, Stronger Outcomes - InfraBuild","isPartOf":{"@id":"\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.infrabuild.com\/case-studies\/partnering-for-progress-at-diggers-rest-smarter-supply-stronger-outcomes\/#primaryimage"},"image":{"@id":"https:\/\/www.infrabuild.com\/case-studies\/partnering-for-progress-at-diggers-rest-smarter-supply-stronger-outcomes\/#primaryimage"},"thumbnailUrl":"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-2.png","datePublished":"2026-06-01T22:00:00+00:00","description":"How InfraBuild supported the Diggers Rest level crossing removal with local steel, prefabrication and a smarter digital supply chain.","breadcrumb":{"@id":"https:\/\/www.infrabuild.com\/case-studies\/partnering-for-progress-at-diggers-rest-smarter-supply-stronger-outcomes\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.infrabuild.com\/case-studies\/partnering-for-progress-at-diggers-rest-smarter-supply-stronger-outcomes\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.infrabuild.com\/case-studies\/partnering-for-progress-at-diggers-rest-smarter-supply-stronger-outcomes\/#primaryimage","url":"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-2.png","contentUrl":"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2026\/05\/Diggers-Rest-level-crossing-removal-steel-supply-2.png","width":1890,"height":1471},{"@type":"BreadcrumbList","@id":"https:\/\/www.infrabuild.com\/case-studies\/partnering-for-progress-at-diggers-rest-smarter-supply-stronger-outcomes\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.infrabuild.com\/"},{"@type":"ListItem","position":2,"name":"Case Studies","item":"https:\/\/www.infrabuild.com\/case-studies\/"},{"@type":"ListItem","position":3,"name":"Partnering for Progress at Diggers Rest: Smarter Supply, Stronger Outcomes"}]},{"@type":"WebSite","@id":"\/#website","url":"\/","name":"InfraBuild","description":"Building futures through sustainable steel","publisher":{"@id":"\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"\/#organization","name":"InfraBuild","url":"\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"\/#\/schema\/logo\/image\/","url":"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2022\/03\/infrabuild-logo.png","contentUrl":"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2022\/03\/infrabuild-logo.png","width":400,"height":98,"caption":"InfraBuild"},"image":{"@id":"\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/case_study\/44104","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/case_study"}],"about":[{"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/types\/case_study"}],"author":[{"embeddable":true,"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/users\/179"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/media\/44116"}],"wp:attachment":[{"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/media?parent=44104"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/tags?post=44104"},{"taxonomy":"business_division","embeddable":true,"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/business_division?post=44104"},{"taxonomy":"case_study_sector","embeddable":true,"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/case_study_sector?post=44104"},{"taxonomy":"case_study_solution","embeddable":true,"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/case_study_solution?post=44104"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}