{"id":22117,"date":"2021-07-11T12:03:45","date_gmt":"2021-07-11T12:03:45","guid":{"rendered":"https:\/\/infrabuild.dev-serv.net\/?post_type=case_study&#038;p=22117"},"modified":"2022-08-18T11:33:43","modified_gmt":"2022-08-18T01:33:43","slug":"23-doody-street","status":"publish","type":"case_study","link":"https:\/\/www.infrabuild.com\/case-studies\/23-doody-street\/","title":{"rendered":"23 Doody Street"},"content":{"rendered":"\n\n\t<span><span><a href=\"https:\/\/www.infrabuild.com\/\">Home<\/a><\/span><\/span>\n\n<h3>\n\t\tBARMAT\u00ae delivers in first NSW commercial trial\n\t<\/h3>\n\t<p>The first commercial trial of BARMAT\u00ae in NSW, the 23 Doody Street project experienced a 50% productivity benefit through the use of BARMAT\u00ae in a fourth storey floor slab. This benefit was delivered with no material or labour cost increase when compared to traditional steel fixing.<\/p>\n\t<h4>Delivering efficiencies<\/h4>\n<p>Identifying benefits for the project began at the planning stage for the InfraBuild Reinforcing team. In collaboration with the project team, InfraBuild identified BARMAT\u00ae, our exclusive, customisable prefab bar mat as the perfect solution for the building&#8217;s upper floor slab where installation was complicated by an external hob beam.<\/p>\n\t<h3>Project Details<\/h3>\n<p><strong>Location: <\/strong><\/p>\n<p>New South Wales<\/p>\n<p><strong>Name: <\/strong><\/p>\n<p>23 Doody Street<\/p>\n<p><strong>Solution: <\/strong><\/p>\n<p>BARMAT\u00ae<\/p>\n<h4>\n\t\tBARMAT\u00ae Benefits for 23 Doody Street:\n\t<\/h4>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<h4>Custom configuration<\/h4>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<p>larger mats allowed for more efficient steel fixing<\/p>\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t\t<h4>Time Savings<\/h4>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<p>What would have taken two days was completed in one morning<\/p>\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t\t<h4>Safety Benefit<\/h4>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<p>Stronger, stable mats provided surer footing &amp; a safer platform<\/p>\t\t\t\t\t\t\t\t\t\t\t\n\t<p>In utilising a bespoke BARMAT solution, the onsite team\u00a0were able to avoid the labour-intensive work associated\u00a0with cutting traditional reinforcing steel to interact with\u00a0structures. Maximising the flexible design inherent to\u00a0BARMAT\u00ae, the mats were designed to fit around the hob\u00a0beam. Each mat had its own configuration and was clearly\u00a0labelled to indicate its position within the slab. Mats ranged\u00a0in size from 3 x 3.35 m where they interacted with the hob\u00a0beam and other elements, up to 7 x 8.5 m where interaction\u00a0was minimal and larger mats allowed\u00a0for more efficient steel fixing.\u00a0Fabricated from N12 bar, the mats\u00a0weighed up to 180 kg each and a crane\u00a0was used to ease onsite handling for\u00a0fixers on the fourth floor: installation\u00a0was as simple as lifting, placing and\u00a0fixing. Gavin Elterman, 23 Doody\u00a0Street&#8217;s owner and project manager,\u00a0identified BARMAT\u00ae as delivering\u00a0significant time and labour savings.<\/p>\n<p>&#8220;To complete this slab to my standards\u00a0using traditional steel fixing would\u00a0have taken two days. Using BARMAT\u00ae,\u00a0a full day of work was completed in a\u00a0morning using my team and a crane to\u00a0lift and place the mats into place,&#8221; said\u00a0Mr Elterman.<\/p>\n<h3>\n\t\tWant the PDF?\n\t<\/h3>\n\t\t\t<a href=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2022\/02\/IBR-23DoodySt-BARMAT.pdf\" target=\"_self\" role=\"button\" rel=\"noopener\">\n\t\t\t\t\t\t\tView or Download\n\t\t\t\t\t<\/a>\n\t<h4>A safer solution<\/h4>\n<p>Beyond time and labour efficiencies, BARMAT\u00ae offered safety benefits to the project. While a prefabricated solution has long been recognised as improving site safety through fabricating reinforcing elements offsite in a controlled factory environment, 23 Doody Street workers identified additional benefits. Rather than working atop traditional Class L mesh the welded N12 bars which formed the project&#8217;s mats were significantly stronger and allowed for surer footing.<\/p>\n<p>&#8220;BARMAT\u00ae provided a more stable walking platform due to the welded intersections, providing a safer working platform compared to conventional tie wire fixed reinforcement,&#8221; Mr Elterman said.<\/p>\n<p>In delivering labour and time efficiencies and improved safety for the project, as well as a better installation experience for the steel fixers, BARMAT\u00ae proved an essential solution in its first New South Wales commercial trial.<\/p>\n\n","protected":false},"author":26,"featured_media":22119,"menu_order":0,"template":"","meta":{"_acf_changed":false,"_members_access_role":[],"_members_access_error":""},"tags":[],"business_division":[111],"case_study_sector":[120],"case_study_solution":[124],"class_list":["post-22117","case_study","type-case_study","status-publish","has-post-thumbnail","hentry","business_division-reinforcing","case_study_sector-commercial","case_study_solution-prefabrication"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.2 (Yoast SEO v28.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>23 Doody Street - InfraBuild<\/title>\n<meta name=\"description\" content=\"The first commercial trial of BARMAT\u00ae in NSW, the 23 Doody Street project experienced a 50% productivity benefit through the use of BARMAT\u00ae\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.infrabuild.com\/case-studies\/23-doody-street\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"23 Doody Street\" \/>\n<meta property=\"og:description\" content=\"The first commercial trial of BARMAT\u00ae in NSW, the 23 Doody Street project experienced a 50% productivity benefit through the use of BARMAT\u00ae\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.infrabuild.com\/case-studies\/23-doody-street\/\" \/>\n<meta property=\"og:site_name\" content=\"InfraBuild\" \/>\n<meta property=\"article:modified_time\" content=\"2022-08-18T01:33:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2022\/02\/MVIMG-20200622-095634-16x9-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1125\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/23-doody-street\\\/\",\"url\":\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/23-doody-street\\\/\",\"name\":\"23 Doody Street - InfraBuild\",\"isPartOf\":{\"@id\":\"\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/23-doody-street\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/23-doody-street\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.infrabuild.com\\\/wp-content\\\/uploads\\\/sites\\\/8\\\/2022\\\/02\\\/MVIMG-20200622-095634-16x9-1.jpg\",\"datePublished\":\"2021-07-11T12:03:45+00:00\",\"dateModified\":\"2022-08-18T01:33:43+00:00\",\"description\":\"The first commercial trial of BARMAT\u00ae in NSW, the 23 Doody Street project experienced a 50% productivity benefit through the use of BARMAT\u00ae\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/23-doody-street\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/23-doody-street\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/23-doody-street\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.infrabuild.com\\\/wp-content\\\/uploads\\\/sites\\\/8\\\/2022\\\/02\\\/MVIMG-20200622-095634-16x9-1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.infrabuild.com\\\/wp-content\\\/uploads\\\/sites\\\/8\\\/2022\\\/02\\\/MVIMG-20200622-095634-16x9-1.jpg\",\"width\":2000,\"height\":1125},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/23-doody-street\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.infrabuild.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Case Studies\",\"item\":\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"23 Doody Street\"}]},{\"@type\":\"WebSite\",\"@id\":\"\\\/#website\",\"url\":\"\\\/\",\"name\":\"InfraBuild\",\"description\":\"Building futures through sustainable steel\",\"publisher\":{\"@id\":\"\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"\\\/#organization\",\"name\":\"InfraBuild\",\"url\":\"\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.infrabuild.com\\\/wp-content\\\/uploads\\\/sites\\\/8\\\/2022\\\/03\\\/infrabuild-logo.png\",\"contentUrl\":\"https:\\\/\\\/www.infrabuild.com\\\/wp-content\\\/uploads\\\/sites\\\/8\\\/2022\\\/03\\\/infrabuild-logo.png\",\"width\":400,\"height\":98,\"caption\":\"InfraBuild\"},\"image\":{\"@id\":\"\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"23 Doody Street - InfraBuild","description":"The first commercial trial of BARMAT\u00ae in NSW, the 23 Doody Street project experienced a 50% productivity benefit through the use of BARMAT\u00ae","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.infrabuild.com\/case-studies\/23-doody-street\/","og_locale":"en_US","og_type":"article","og_title":"23 Doody Street","og_description":"The first commercial trial of BARMAT\u00ae in NSW, the 23 Doody Street project experienced a 50% productivity benefit through the use of BARMAT\u00ae","og_url":"https:\/\/www.infrabuild.com\/case-studies\/23-doody-street\/","og_site_name":"InfraBuild","article_modified_time":"2022-08-18T01:33:43+00:00","og_image":[{"width":2000,"height":1125,"url":"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2022\/02\/MVIMG-20200622-095634-16x9-1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.infrabuild.com\/case-studies\/23-doody-street\/","url":"https:\/\/www.infrabuild.com\/case-studies\/23-doody-street\/","name":"23 Doody Street - InfraBuild","isPartOf":{"@id":"\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.infrabuild.com\/case-studies\/23-doody-street\/#primaryimage"},"image":{"@id":"https:\/\/www.infrabuild.com\/case-studies\/23-doody-street\/#primaryimage"},"thumbnailUrl":"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2022\/02\/MVIMG-20200622-095634-16x9-1.jpg","datePublished":"2021-07-11T12:03:45+00:00","dateModified":"2022-08-18T01:33:43+00:00","description":"The first commercial trial of BARMAT\u00ae in NSW, the 23 Doody Street project experienced a 50% productivity benefit through the use of BARMAT\u00ae","breadcrumb":{"@id":"https:\/\/www.infrabuild.com\/case-studies\/23-doody-street\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.infrabuild.com\/case-studies\/23-doody-street\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.infrabuild.com\/case-studies\/23-doody-street\/#primaryimage","url":"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2022\/02\/MVIMG-20200622-095634-16x9-1.jpg","contentUrl":"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2022\/02\/MVIMG-20200622-095634-16x9-1.jpg","width":2000,"height":1125},{"@type":"BreadcrumbList","@id":"https:\/\/www.infrabuild.com\/case-studies\/23-doody-street\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.infrabuild.com\/"},{"@type":"ListItem","position":2,"name":"Case Studies","item":"https:\/\/www.infrabuild.com\/case-studies\/"},{"@type":"ListItem","position":3,"name":"23 Doody Street"}]},{"@type":"WebSite","@id":"\/#website","url":"\/","name":"InfraBuild","description":"Building futures through sustainable steel","publisher":{"@id":"\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"\/#organization","name":"InfraBuild","url":"\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"\/#\/schema\/logo\/image\/","url":"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2022\/03\/infrabuild-logo.png","contentUrl":"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2022\/03\/infrabuild-logo.png","width":400,"height":98,"caption":"InfraBuild"},"image":{"@id":"\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/case_study\/22117","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/case_study"}],"about":[{"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/types\/case_study"}],"author":[{"embeddable":true,"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/users\/26"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/media\/22119"}],"wp:attachment":[{"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/media?parent=22117"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/tags?post=22117"},{"taxonomy":"business_division","embeddable":true,"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/business_division?post=22117"},{"taxonomy":"case_study_sector","embeddable":true,"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/case_study_sector?post=22117"},{"taxonomy":"case_study_solution","embeddable":true,"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/case_study_solution?post=22117"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}