{"id":19137,"date":"2020-02-26T11:00:00","date_gmt":"2020-02-26T00:00:00","guid":{"rendered":"https:\/\/infrabuild.dev-serv.net\/case_study\/structural_steel_for_william_street_bridge\/"},"modified":"2022-03-15T13:52:56","modified_gmt":"2022-03-15T03:52:56","slug":"structural-steel-for-william-street-bridge","status":"publish","type":"case_study","link":"https:\/\/www.infrabuild.com\/case-studies\/structural-steel-for-william-street-bridge\/","title":{"rendered":"Structural steel for William Street Bridge"},"content":{"rendered":"<p><strong>A long-span bridge above the future entrance of the Metro Tunnel near Melbourne\u2019s William Street has been constructed with the use of high-grade steel supplied by InfraBuild Steel Centre.<\/strong><\/p>\n<figure data-asset-id=\"a84a0968-c468-4671-92e0-35682ce8cad4\" data-image-id=\"a84a0968-c468-4671-92e0-35682ce8cad4\"><img decoding=\"async\" src=\"https:\/\/assets-au-01.kc-usercontent.com:443\/b8597ab4-7523-0251-00bb-4053bf5df859\/d717da81-18c9-44f5-8dec-1ebe6eb3cef7\/William%20Street%20Bridge%20Infographic%20Feb%202020_V2.jpg\" alt=\"\" data-asset-id=\"a84a0968-c468-4671-92e0-35682ce8cad4\" data-image-id=\"a84a0968-c468-4671-92e0-35682ce8cad4\" \/><\/figure>\n<p>Structural steel supplied by InfraBuild Steel Centre has been used in the construction of a new bridge over the widened rail corridor near Melbourne\u2019s South Yarra Station.\u00a0<\/p>\n<p>Approximately 140 tonnes of welded beams were supplied for the long-span William Street Bridge, which was installed above the future eastern entrance of the Metro Tunnel near William Street.\u00a0<\/p>\n<p>The project\u2019s Rail Infrastructure Alliance, featuring major contractors John Holland and CPB, installed the bridge structure during a weekend rail occupation in November 2019.\u00a0<\/p>\n<p>The new bridge spans the rail corridor, is 57 metres long, 3.8 metres high and approximately 30 metres wide at its widest point.<\/p>\n<h4>The challenge: a long-span bridge built to last<\/h4>\n<p>The William Street Bridge needed to span several rail lines and featured difficult approach angles. This required that a number of non-standard lengths of welded beam be used. InfraBuild Steel Centre put steel plate on order that was then used to manufacture a mixture of 800 (80cm high) and 1000 (1m high) welded beams for fabricator Bowhill Engineering.<\/p>\n<figure data-asset-id=\"84130d84-89dd-4027-8390-e696e9e666e3\" data-image-id=\"84130d84-89dd-4027-8390-e696e9e666e3\"><img decoding=\"async\" src=\"https:\/\/assets-au-01.kc-usercontent.com:443\/b8597ab4-7523-0251-00bb-4053bf5df859\/debfe1f9-0085-42c6-88e1-03cadd63e1da\/William%20Street%20Bridge%20V8.jpg\" alt=\"\" data-asset-id=\"84130d84-89dd-4027-8390-e696e9e666e3\" data-image-id=\"84130d84-89dd-4027-8390-e696e9e666e3\" \/><\/figure>\n<p>With the beams a mixture of different lengths and sections, project lead-time required special consideration, plus a large degree of collaboration between supplier InfraBuild Steel Centre and fabricator Bowhill Engineering was needed.<\/p>\n<p>InfraBuild Steel Centre was tasked with manufacturing each welded beam to a bespoke length, with Bowhill Engineering needing to ensure precise fabrication of the spanning beams and cross-members to allow seamless construction of the bridge\u2019s constituent parts on site.\u00a0\u00a0\u00a0\u00a0<\/p>\n<h4>The solution: bespoke beam lengths and precision fabrication<\/h4>\n<p>InfraBuild Steel Centre\u2019s Gordon Smith says high-grade G400 steel was used to make the welded beams, which were supplied to Bowhill Engineering from Steel Centre\u2019s Port Adelaide branch.\u00a0\u00a0<\/p>\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>G400 steel is a low-tempurature steel that offers durability and strength, so it&#8217;s commonly found in the likes of bridge construction. For this bridge, the long lengths required were highly unusual and required considerable planning to meet Bowhill&#8217;s needs.<\/p><cite>Gordon Smith, InfraBuild Steel Centre<\/cite><\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">Bowhill Engineering, which specialises in high-spec, large-component fabrication of steel for bridges, wharves and other critical structures, then fabricated and assembled the bridge at the company\u2019s yard east of Adelaide.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/assets-au-01.kc-usercontent.com:443\/b8597ab4-7523-0251-00bb-4053bf5df859\/2b69b934-012b-4048-9642-da5c6d7f444d\/William%20Street%20Bridge%20Melbourne%20700x400.jpg\" alt=\"\"\/><\/figure><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe pre-assembled the entire bridge to ensure everything would go smoothly on site,\u201d said Bowhill Engineering Senior Project Manager Michael Harris.&nbsp;<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>The beams were longer than standard &#8211; to avoid a spliced weld, we had them custom-made lengthwise by InfraBuild. We did finer cuts to them once the drawings were approved, put end plates on and, on average, put two shear studs every 300 mm across the length of them.<\/p><cite>Gordon Smith, InfraBuild Steel Centre<\/cite><\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe ordered the beams without a pre-camber, so we pre-cambered them after fabrication,\u201d Gordon explains.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThe whole thing had to be super accurate. When you\u2019re installing spanning beams and putting intermediate beams between them, you have to be spot-on for that to work. We had different angles on the stubs that were welded to the main beams and had to make sure the bolted splice flanges were accurate at the end of the beams.\u201d&nbsp;<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">The outcome<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">The two spanning beams, weighing a combined 244 tonnes, were used to construct the bridge sides, with a 750-tonne crane and two smaller cranes used to position the spanning beams in place. The Rail Infrastructure Alliance project team installed these over the course of a weekend to minimise disruptions to rail traffic. With these spanning beams secured, the team then installed a series of intermediate steel supports, with pre-cast planks laid on top to form the bridge.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>InfraBuild supplied a good product on time. They wored with the design team and procurement team earky on in the piece.<\/p><cite>Michael Harris, Bowhill Engineering Senior Project Manager<\/cite><\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">Harris explains that the spanning beams made for an impressive sight. \u201cThey were 4m deep and some of the flange material was 100mm thick. Where you\u2019ve got a splice you had 260mm of solid steel.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cIt\u2019s the most heavy-duty material I think we\u2019ve ever used on a job from a plate perspective,\u201d Harris said.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">William Street Bridge Project Team<\/h4>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Primary contractor: <\/strong>Rail Infrastructure Alliance (John Holland \/ CPB Contractors JV)<\/li><li><strong>Steel Supplier: <\/strong>InfraBuild Steel Centre<\/li><li><strong>Fabricator: <\/strong>Bowhill Engineering<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Video courtesy Rail Projects Victoria<\/em><\/p>\n","protected":false},"author":26,"featured_media":19138,"menu_order":0,"template":"","meta":{"_acf_changed":false,"_members_access_role":[],"_members_access_error":""},"tags":[],"business_division":[112],"case_study_sector":[121],"case_study_solution":[130],"class_list":["post-19137","case_study","type-case_study","status-publish","has-post-thumbnail","hentry","business_division-steel-centre","case_study_sector-civil","case_study_solution-structural-steel"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.2 (Yoast SEO v28.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Structural steel for William Street Bridge - InfraBuild<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Structural steel for William Street Bridge\" \/>\n<meta property=\"og:description\" content=\"A long-span bridge above the future entrance of the Metro Tunnel near Melbourne\u2019s William Street has been constructed with the use of high-grade steel supplied by InfraBuild Steel Centre. Structural steel supplied by InfraBuild Steel Centre has been used in the construction of a new bridge over the widened rail corridor near Melbourne\u2019s South Yarra&hellip;\" \/>\n<meta property=\"og:site_name\" content=\"InfraBuild\" \/>\n<meta property=\"article:modified_time\" content=\"2022-03-15T03:52:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2020\/02\/William-Street-Bridge-Melbourne-hero-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"500\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":null,\"url\":null,\"name\":\"Structural steel for William Street Bridge - InfraBuild\",\"isPartOf\":{\"@id\":\"\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"#primaryimage\"},\"image\":{\"@id\":\"#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.infrabuild.com\\\/wp-content\\\/uploads\\\/sites\\\/8\\\/2020\\\/02\\\/William-Street-Bridge-Melbourne-hero-1.jpg\",\"datePublished\":\"2020-02-26T00:00:00+00:00\",\"dateModified\":\"2022-03-15T03:52:56+00:00\",\"breadcrumb\":{\"@id\":\"#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[null]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"#primaryimage\",\"url\":\"https:\\\/\\\/www.infrabuild.com\\\/wp-content\\\/uploads\\\/sites\\\/8\\\/2020\\\/02\\\/William-Street-Bridge-Melbourne-hero-1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.infrabuild.com\\\/wp-content\\\/uploads\\\/sites\\\/8\\\/2020\\\/02\\\/William-Street-Bridge-Melbourne-hero-1.jpg\",\"width\":1600,\"height\":500},{\"@type\":\"BreadcrumbList\",\"@id\":\"#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.infrabuild.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Case Studies\",\"item\":\"https:\\\/\\\/www.infrabuild.com\\\/case-studies\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Structural steel for William Street Bridge\"}]},{\"@type\":\"WebSite\",\"@id\":\"\\\/#website\",\"url\":\"\\\/\",\"name\":\"InfraBuild\",\"description\":\"Building futures through sustainable steel\",\"publisher\":{\"@id\":\"\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"\\\/#organization\",\"name\":\"InfraBuild\",\"url\":\"\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.infrabuild.com\\\/wp-content\\\/uploads\\\/sites\\\/8\\\/2022\\\/03\\\/infrabuild-logo.png\",\"contentUrl\":\"https:\\\/\\\/www.infrabuild.com\\\/wp-content\\\/uploads\\\/sites\\\/8\\\/2022\\\/03\\\/infrabuild-logo.png\",\"width\":400,\"height\":98,\"caption\":\"InfraBuild\"},\"image\":{\"@id\":\"\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Structural steel for William Street Bridge - InfraBuild","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Structural steel for William Street Bridge","og_description":"A long-span bridge above the future entrance of the Metro Tunnel near Melbourne\u2019s William Street has been constructed with the use of high-grade steel supplied by InfraBuild Steel Centre. Structural steel supplied by InfraBuild Steel Centre has been used in the construction of a new bridge over the widened rail corridor near Melbourne\u2019s South Yarra&hellip;","og_site_name":"InfraBuild","article_modified_time":"2022-03-15T03:52:56+00:00","og_image":[{"width":1600,"height":500,"url":"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2020\/02\/William-Street-Bridge-Melbourne-hero-1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":null,"url":null,"name":"Structural steel for William Street Bridge - InfraBuild","isPartOf":{"@id":"\/#website"},"primaryImageOfPage":{"@id":"#primaryimage"},"image":{"@id":"#primaryimage"},"thumbnailUrl":"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2020\/02\/William-Street-Bridge-Melbourne-hero-1.jpg","datePublished":"2020-02-26T00:00:00+00:00","dateModified":"2022-03-15T03:52:56+00:00","breadcrumb":{"@id":"#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":[null]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"#primaryimage","url":"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2020\/02\/William-Street-Bridge-Melbourne-hero-1.jpg","contentUrl":"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2020\/02\/William-Street-Bridge-Melbourne-hero-1.jpg","width":1600,"height":500},{"@type":"BreadcrumbList","@id":"#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.infrabuild.com\/"},{"@type":"ListItem","position":2,"name":"Case Studies","item":"https:\/\/www.infrabuild.com\/case-studies\/"},{"@type":"ListItem","position":3,"name":"Structural steel for William Street Bridge"}]},{"@type":"WebSite","@id":"\/#website","url":"\/","name":"InfraBuild","description":"Building futures through sustainable steel","publisher":{"@id":"\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"\/#organization","name":"InfraBuild","url":"\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"\/#\/schema\/logo\/image\/","url":"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2022\/03\/infrabuild-logo.png","contentUrl":"https:\/\/www.infrabuild.com\/wp-content\/uploads\/sites\/8\/2022\/03\/infrabuild-logo.png","width":400,"height":98,"caption":"InfraBuild"},"image":{"@id":"\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/case_study\/19137","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/case_study"}],"about":[{"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/types\/case_study"}],"author":[{"embeddable":true,"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/users\/26"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/media\/19138"}],"wp:attachment":[{"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/media?parent=19137"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/tags?post=19137"},{"taxonomy":"business_division","embeddable":true,"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/business_division?post=19137"},{"taxonomy":"case_study_sector","embeddable":true,"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/case_study_sector?post=19137"},{"taxonomy":"case_study_solution","embeddable":true,"href":"https:\/\/www.infrabuild.com\/wp-json\/wp\/v2\/case_study_solution?post=19137"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}